Sturgeon Bays Michigan Street Bridge reopening date still unknown

Published May 22, 2010 at 5:00 a.m.
Like the lift spans so many Sturgeon Bay residents have gotten used to seeing since the Michigan Street Bridge closed in September 2008, the final reopening date remains up in the air.


Back | Read more at Door County Advocate

Tagthis You must log in to tag articles
Separate tags with commas
Rate this now!
  • Average rating: 2.7
  • 1
  • 2
  • 3
  • 4
  • 5
Number of ratings: 6 - Average rating: 2.7

Posted by: Tax Payer on OnDoorCounty.org on June 11, 2010 at 12:16 p.m.
They should have torn the pile of junk down and recyled it! What a waste of tax dollars!